Post-tension slab
A concrete slab with steel cables tensioned after the pour. Common in newer Central Texas homes; repair conversations differ from conventional rebar slabs.
Pier (push / pressed / helical)
A deep support point that transfers load below the active clay zone. Push/pressed and helical are the two families you’ll hear most often here.
Shim
A spacer used under beams on pier-and-beam homes to adjust level. Sometimes part of a re-level; sometimes a temporary measure.
Elevation survey
A map of relative floor heights across the house. The baseline for deciding whether movement is worth repairing.
Heave vs. settlement
Heave is the soil pushing up (often wet clay). Settlement is the soil or fill dropping. Both can crack finishes; the fix depends on which you’re dealing with.
PE letter
A written opinion from a licensed professional engineer. Often requested for sales, lenders, or complex repairs — separate from the contractor’s inspection.